摘 要:
對大壩內(nèi)觀監(jiān)測儀器在工程應(yīng)用中的儀器電纜、數(shù)據(jù)檢驗(yàn)、儀器鑒定等問題進(jìn)行了探討,對內(nèi)觀監(jiān)測差阻式儀器埋設(shè)時(shí)電纜接頭工藝的改進(jìn),以及觀測異常數(shù)據(jù)判別與差阻式監(jiān)測儀器運(yùn)行期傳感器的鑒定進(jìn)行了論述,并結(jié)合具體實(shí)例進(jìn)行了分析。同時(shí),強(qiáng)調(diào)了作為安全監(jiān)測中間環(huán)節(jié)的儀器埋設(shè)安裝和數(shù)據(jù)采集質(zhì)量控制的重要性.
Abstract:
Discussed are instrument cables, data verification and instrument identification of the inner differential resistance monitoring instruments applied to dam engineering, with emphasis laid on the improvement of cable joint technique for differential resistance instrument laying, the differentiation of the abnormal data, as well as the sensor identification during the operation period of the inner differential resistance-- monitoring instrument, combined with example analysis. At the same time, the importance of the instrument laying and installation and the quality control of data acquisition are stressed as the intermediate links of a safety monitoring project.文章下載:
![]() |
/uploads/soft/200908/1_02134433.rar |